avArc

avArc - a landscape of memory and temporalities

PoH-Code: poh.34091

Information panel on forced labor during the construction of the Drau hydroelectric power plant in Schwabeck

—

Informationstafel zur Zwangsarbeit beim Bau des Draukraftwerks in Schwabeck

DERLA / GAMS, Universität Graz · CC-BY-NC-4.0 · gams.uni-graz.at

The Schwabeck hydroelectric power plant north of the village of Lavamünd on the Drava was built from 1939 to 1943, at the same time as the nearby Lavamünd power plant. During construction, several thousand forced laborers and prisoners of war of various nationalities were used; 45 deaths have been documented. The memorial plaque serves as an information panel about the results of a commission of historians, which, on behalf of the company Verbund, examined the historical events. The information panel is located directly on the road, just before the entrance gate to the power plant area on the left.

Translation · AI tier 7

Sources

  • DERLA — Informationstafel zur Zwangsarbeit beim Bau des Draukraftwerks in Schwabeck (0825ce3d-d69c-44dd-ad06-31fa7411fb77) — DERLA — Informationstafel zur Zwangsarbeit beim Bau des Draukraftwerks in Schwabeck

Evaluations

  • Access (from 07/19/2026): Open access
  • Spatial accuracy: 4 — Accurate

Location & map

Map position available (Point) · spatial accuracy: 4 — Accurate

Textual location description

Wunderstätten 21, 9473 Lavamünd

Map overview
Karte: © OpenStreetMap-Mitwirkende, OpenTopoMap (CC-BY-SA), SRTM

Coordinates (WGS84)46.65837° N, 14.87593° E

Get Involved